Newsletter Signup     Trial & Evaluation     Contact Us     Product Quick Select:
 
 Products               Resources & Training               Service & Support               About Slaughter

 

6330 Demonstration Guide

Test Connections

The 6330 comes with the following supplied accessories:

Part Number Description
99-10467-01 Adapter Box
99-10457-01 LLT Case Lead
99-10468-01 LLT Ground Lead
99-10009-01 Ground Bond Output
99-10008-01 Return Lead
99-10469-01 LLT Input Line
99-10470-01 LLT Input Neutral
99-10471-01 LLT Output Line
99-10472-01 LLT Output Neutral
102-055-913 High Voltage Cable

In order to perform a Line Leakage and/or Functional Run test, an external power supply must be used to provide power to the device under test. The power supply must be an unbalanced, single phase 0-277 VAC supply.

Line Leakage / Functional Run stand alone test lead connections

To connect the 6330 to your power source, we provide two black input power leads terminated in one end (p/n’s 99-10469-01 & 99-10470-01). Connect the terminated end in the DUT Power input terminals on the back panel of the 6330. The un-terminated ends are to be connected to the power source.

Also provided with the 6330 are two white output power leads terminated in one end (p/n’s 99-10472-01 & 99-10471-01). Connect the terminated ends in the DUT output terminals on the back panel of the 6330. The un-terminated ends are to be connected to your DUT

Connect the LLT Ground lead into the back panel Ground connection terminal of the 6330. Then connect the LLT Case lead to the Case connection terminal of the 6330. Then connection the LLT Ground lead to your test fixture and the LLT Case lead to the chassis of your DUT.

6330 Line Leakage / Functional Run stand alone test lead connections

Adapter Box Connections

The 6330 comes standard with an Adapter Box (p/n 99-10467-01) that provides an easy way to connect a DUT that is terminated in a three-prong line cord. Please note that the adapter box may only be connected to the rear panel of the 6330.

To connect the 6330 to your power source, we provide two black input power leads terminated in one end (p/n’s 99-10469-01 & 99-10470-01). Connect the terminated end in the DUT Power input terminals on the back panel of the 6330. The un-terminated ends are to be connected to the power source.

Then connect the DUT output line connection lead from the adapter box to the back panel DUT output line connection terminal of the 6330. Next connect the DUT output neutral connection lead from the adapter box to the back panel DUT output neutral connection terminal of the 6330. Then connect the ground lead from the adapter box into the back panel Ground connection terminal of the 6330. Next connect the LLT Case lead to the Case connection terminal of the 6330. Then connect LLT Case lead to the chassis of your DUT. Last plug the line cord of your DUT into the adapter box.

6330 Adapter box connection




About Slaughter
Our Technology
Our History
Our Clients
Press Releases
Contact Us
International Offices
Site Map
Home



Products
Product Selection Guide
Multi-Function Testers
Hipot Testers
Manufactured/Modular Home Hipot Testers
Ground Bond Testers
Insulation Resistance Testers
Accessories
Trial & Evaluation Request
Obsolete Models
Reconditioned Models



Resources & Training
Manufactured Homes Seminar
Manufactured Homes Testing Resources
FAQ's
Glossary of Terms
Owner's Manuals
White Papers
Demo Guide/Quick Start
Literature Request
Safety Agency Resources
Ask us a question



Service & Support
Calibration & Service Program
Product Delivery Policy
Return Policy
Warranty Policies
Trade-In Policy
Product Registration
Privacy Policy


©2008 Slaughter Company, Inc. | Toll Free:1-800-504-0055 | Phone:1-847-932-3662